Description
In recent years, we have carried out various assignments for Christian Zeiler and we have also received the assignment for the heating installation for his latest project Red Tomatoes Produktion GmbH. It concerns a greenhouse with a total area of over 7 Ha. which, at some point in the future, can be expanded by a further 2 Ha. The entire heating system comprising a boiler house with a boiler of 8 GCal and a heating storage tank of 2,800 m3 is connected via underground pipelines to a biomass power station. The CO2 is partly produced through their own boiler and CO2 is also delivered via a pipeline from the biomass power station. In the greenhouses a conventional pipe rail heating of 10 x 51 mm pipe has been installed.
Look for more information at this Climate Control Greenhouse project; http://www.hortidaily.com/article/21860/Austrian-grower-builts-8-hectares-in-record-time